Thyssenkrupp Nucera opens pilot solid-oxide electrolyser production plant in Germany

The technology requires 20-30% less electricity than conventional low-temperature electrolysers to produce each kilo of green hydrogen when paired with an external waste heat source

Opening of the pilot production facility for SOEC electrolyzers at the Fraunhofer Center in Arnstadt, Thuringia.
Opening of the pilot production facility for SOEC electrolyzers at the Fraunhofer Center in Arnstadt, Thuringia.Photo: Paul-Philipp Braun/Thyssenkrupp Nucera
Published 27 May 2025, 10:06Updated 27 May 2025, 12:22
solid oxide electrolysers (SOEC)Thyssenkrupp NuceraGermanyEurope