EXCLUSIVE | European Hydrogen Bank's largest winner withdraws from subsidy negotiations
As part of a permitting revision, the Zeevonk green H2 facility will no longer be able to start operations before 2030
As part of a permitting revision, the Zeevonk green H2 facility will no longer be able to start operations before 2030