Engie to spend another €40m to fully convert Dutch power plant to run on 50% hydrogen
However, the utility notes that the availability of H2 and infrastructure to deliver it is “still pending” in the Netherlands
However, the utility notes that the availability of H2 and infrastructure to deliver it is “still pending” in the Netherlands