Chevron to develop its first green hydrogen plant, drawing on existing solar power at California oil field

The 5MW facility is due to supply H2 refuelling stations throughout the state from 2026, depending on 'flexible and supportive' policies at state and federal level

An aerial photograph of the 29MW Lost Hills solar array.
An aerial photograph of the 29MW Lost Hills solar array.Photo: Chevron
Published 4 March 2024, 12:04Updated 4 March 2024, 12:04